Violation Detail
Standard Cited: 19100212 A03 II General requirements for all machines.
Inspection Nr: 1255932.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $12,675.00
Current Penalty: $10,140.00
Issuance Date: 11/09/2017
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 11/27/2017
Gravity:
Report ID: 0523900
Contest Date:
Final Order: 11/30/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/30/2017 | $10,140.00 | 11/27/2017 | Other | |
| Penalty | Z: Issued | 11/09/2017 | $12,675.00 | 11/27/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.212(a)(3)(ii): Point(s) of operation of machinery were not guarded or guards were not designed and constructed to prevent employee(s) from having any part of their body in the danger zone(s) during operating cycle: (a) Assembly line # 2; On or about July 27, 2017 the Pep-o-Matic slicer did not have effective point of operation guarding.
Translate