Violation Detail
Standard Cited: 19100147 C04 II B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1255766.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $5,654.00
Current Penalty: $3,392.40
Issuance Date: 01/18/2018
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 02/09/2018
Gravity: 5
Report ID: 0419400
Contest Date:
Final Order: 01/31/2018
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/31/2018 | $3,392.40 | 02/09/2018 | Serious | |
| Penalty | Z: Issued | 01/18/2018 | $5,654.00 | 02/09/2018 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii)(B): The energy control procedure did not clearly and specifically specific procedural steps for shutting down, isolating, blocking and securing machines or equipment to control hazardous energy: (a) Plant site - On or about August 11, 2017 energy control procedure for finish mill clamp did not identify all energy sources present, such as but not limited to, stored energy in springs and means to control such energy.
Translate