Violation Detail
Standard Cited: 19100147 D02 The control of hazardous energy (lockout/tagout).
Inspection Nr: 1252485.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,149.00
Current Penalty: $7,334.10
Issuance Date: 11/22/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 12/19/2017
Gravity: 5
Report ID: 0523400
Contest Date:
Final Order: 12/18/2017
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/18/2017 | $7,334.10 | 12/19/2017 | Serious | |
Penalty | Z: Issued | 11/22/2017 | $8,149.00 | 12/19/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(d)(2): Machine or equipment shutdown. The machine or equipment shall be turned off or shut down using the procedures established for the machine or equipment. An orderly shutdown must be utilized to avoid any additional or increased hazard(s) to employees as a result of the equipment stoppage. (a) The employer did not ensure that the Trane HVAC unit was turned off or shut down as required per the company's procedures while greasing the motor. This exposed employees to caught-in-between hazards and amputation injuries.