Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1248932.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,873.00
Current Penalty: $8,873.00
Issuance Date: 11/30/2017
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 12/19/2017
Gravity: 10
Report ID: 0626700
Contest Date: 02/01/2018
Final Order: 02/06/2019
Related Event Code (REC): A
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 02/06/2019 | $8,873.00 | 12/19/2017 | Serious | |
| Penalty | C: Contested | 02/05/2018 | $8,873.00 | 12/19/2017 | Serious | |
| Penalty | Z: Issued | 11/30/2017 | $8,873.00 | 12/19/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels was not fully planked or decked between front uprights and the guardrail supports: a) On or about July 20, 2017, at the job site, the working level of the Fraco ACT8 Mast Climbing Work Platform, approximately 74 feet above the ground, was not fully planked, exposing employees to fall hazards.