Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).

Inspection Nr: 1247394.015

Citation: 01001

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $11,408.00

Current Penalty: $11,408.00

Issuance Date: 09/06/2017

Nr Instances: 26

Nr Exposed: 100

Abatement Date: 09/25/2017

Gravity: 10

Report ID: 0626600

Contest Date: 10/03/2017

Final Order: 03/25/2019

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty R: Review Commission 03/25/2019 $11,408.00 09/25/2017 Serious  
Penalty C: Contested 10/03/2017 $11,408.00 09/25/2017 Serious  
Penalty Z: Issued 09/06/2017 $11,408.00 09/25/2017 Serious  

Text For Citation: 01 Item/Group: 001 Hazard:

29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Viking Nailer, Turbo 505, ID #1 without written procedures to control the release of potentially hazardous energy. b. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Viking Nailer, Turbo 505, ID #2 without written procedures to control the release of potentially hazardous energy. c. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Viking Nailer, Turbo 505, ID #3 without written procedures to control the release of potentially hazardous energy. d. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Viking Nailer, Model Turbo 505, ID #5 without written procedures to control the release of potentially hazardous energy. e. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Viking Nailer, Turbo 505, ID #6 without written procedures to control the release of potentially hazardous energy. f. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining FMC Nailer, Model 423, ID #2 without written procedures to control the release of potentially hazardous energy. g. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining FMC Nailer, Model 423, ID #3 without written procedures to control the release of potentially hazardous energy. h. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Cornell Resaw ID #1 without written procedures to control the release of potentially hazardous energy. i. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Cornell Resaw ID #2 without written procedures to control the release of potentially hazardous energy. j. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Cornell Resaw ID #3 without written procedures to control the release of potentially hazardous energy. k. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Cornell Resaw ID #4 without written procedures to control the release of potentially hazardous energy. l. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Cornell Resaw ID #5 without written procedures to control the release of potentially hazardous energy. m. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Cornell Resaw ID #6 without written procedures to control the release of potentially hazardous energy. n. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Baker Notcher, Model BX, ID #1 without written procedures to control the release of potentially hazardous energy. o. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Baker Notcher, Model BX, ID #2 without written procedures to control the release of potentially hazardous energy. p. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Baker Notcher, Model BX, ID #3 without written procedures to control the release of potentially hazardous energy. q. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Cornell Trim Saw, Line #1 without written procedures to control the release of potentially hazardous energy. r. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Cornell Trim Saw, Line #2 without written procedures to control the release of potentially hazardous energy. s. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Cornell Trim Saw, Line #3 without written procedures to control the release of potentially hazardous energy. t. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Cornell Trim Saw, Line #4 without written procedures to control the release of potentially hazardous energy. u. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Cornell Trim Saw, Line #5 without written procedures to control the release of potentially hazardous energy. v. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Cornell Trim Saw, Line #6 without written procedures to control the release of potentially hazardous energy. w. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Cornell Trim Saw, Line #7 without written procedures to control the release of potentially hazardous energy. x. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Whirlwind Cutoff Saw, Model 212, ID #1 without written procedures to control the release of potentially hazardous energy. y. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Whirlwind Cutoff Saw, Model 212, ID #2 without written procedures to control the release of potentially hazardous energy. z. On or about July 17, 2017, and times prior thereto, in the Production Area, where employees were exposed to struck-by, electrical shock, and caught-in hazards when setting-up, servicing and/or maintaining Whirlwind Cutoff Saw, Model 212, ID #3 without written procedures to control the release of potentially hazardous energy.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.