Violation Detail
Standard Cited: 19260451 B01 I General requirements.
Inspection Nr: 1244918.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 12/07/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 01/04/2018
Gravity:
Report ID: 0316300
Contest Date:
Final Order: 12/20/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/20/2017 | $0.00 | 01/04/2018 | Other | |
| Penalty | Z: Issued | 12/07/2017 | $0.00 | 01/04/2018 | Other |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1)(i): Each platform unit (e.g., scaffold plank, fabricated plank, fabricated deck, or fabricated platform) was not installed so that the space between adjacent units and the space between the platform and the uprights were no more than 1 inch (2.5 cm) wide, except where the employer can demonstrate that a wider space is necessary. (a) Date of Violation: On or about 07-06-2017 and times prior thereto, located at NAS Oceana - Dam Neck Annex 352 Bullpup Street. Virginia Beach, VA 23461, Condition: Employee(s) were exposed to scaffolding planks at heights greater than 10 feet high with gaps in excess of 1 inch. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employee(s) and their representatives were informed of this abatement.