Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1244675.015
Citation: 01001
Citation Type: Serious
Abatement Status:
Initial Penalty: $8,311.00
Current Penalty: $0.00
Issuance Date: 08/24/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 09/06/2017
Gravity: 5
Report ID: 0418300
Contest Date:
Final Order: 09/19/2017
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 09/19/2017 | $0.00 | 09/06/2017 | Serious | |
| Penalty | Z: Issued | 08/24/2017 | $8,311.00 | 09/06/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: (a) On or about 06/29/2017 - Production Area, WP Haton, Sheeter Moulder machine, model BM-80N, serial #HF140017, procedures were not utilized by employees cleaning the machine.