Violation Detail
Standard Cited: 19100179 G01 IV Overhead and gantry cranes.
Inspection Nr: 1234806.015
Citation: 01001
Citation Type: Other
Abatement Status: Corrected During Inspection
Initial Penalty: $8,873.00
Current Penalty: $1,500.00
Issuance Date: 09/22/2017
Nr Instances: 1
Nr Exposed: 40
Abatement Date:
Gravity:
Report ID: 0523400
Contest Date: 10/17/2017
Final Order: 03/09/2018
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 03/09/2018 | $1,500.00 | Other | ||
| Penalty | C: Contested | 10/19/2017 | $8,873.00 | Serious | ||
| Penalty | Z: Issued | 09/22/2017 | $8,873.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.179(g)(1)(iv): Multiple conductor cable was used with a suspended pushbutton station, but the station was not supported in some satisfactory manner that protected the electrical conductors against strain. (a) The pendant electrical control cable for the Cleveland Tramrail 3T overhead crane in Bay three (3) was not provided strain relief which caused the cable to pull away from the pendant and expose the electrical wiring. This exposed employees to an electrical shock hazard.
Translate