Violation Detail
Standard Cited: 19100022 A02 General requirements.
Inspection Nr: 1230382.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $7,243.00
Current Penalty: $7,243.00
Issuance Date: 09/20/2017
Nr Instances: 1
Nr Exposed: 150
Abatement Date: 08/31/2018
Gravity:
Report ID: 0522500
Contest Date: 10/12/2017
Final Order: 07/30/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 07/30/2018 | $7,243.00 | 08/31/2018 | Other | |
Penalty | C: Contested | 10/13/2017 | $7,243.00 | 10/25/2017 | Serious | |
Penalty | Z: Issued | 09/20/2017 | $7,243.00 | 10/25/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.22(a)(2): (2) The floor of each workroom is maintained in a clean and, to the extent feasible, in a dry condition. When wet processes are used, drainage must be maintained and, to the extent feasible, dry standing places, such as false floors, platforms, and mats must be provided. a. At the work site, employees used powdered tints and a wet concrete mixture from an overhead belt to form "stones" using a moving conveyor system. The employer did not ensure that the floors were kept as free as possible from the accumulation of materials falling from the overhead belt, the excess concrete on the mold fill lines, and the water/waste from cleaning operations.