Standard Cited: 19100119 D02 I A Process safety management of highly hazardous chemicals.
Inspection Nr: 1228975.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $6,972.00
Current Penalty: $4,098.57
Issuance Date: 10/27/2017
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 02/03/2020
Gravity:
Report ID: 0134000
Contest Date: 11/20/2017
Final Order: 03/09/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/09/2018 | $4,098.57 | 02/03/2020 | Other | |
Penalty | C: Contested | 12/04/2017 | $6,972.00 | 11/27/2017 | Serious | |
Penalty | Z: Issued | 10/27/2017 | $6,972.00 | 11/27/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.119(d)(2)(i)(A): Information concerning the technology of the process did not include a block flow diagram or simplified process flow diagram: (a) Location - 638 Summer Street, Lynn, MA: On or about 5/1/2017, process safety information compiled for the manufacture of Product included a piping & instrumentation diagram as a substitute for a simplified process flow diagram.