Violation Detail
Standard Cited: 19100036 C01 Design and construction requirements for exit routes.
Inspection Nr: 1227101.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,967.00
Current Penalty: $12,471.00
Issuance Date: 09/29/2017
Nr Instances: 1
Nr Exposed: 9
Abatement Date: 02/16/2018
Gravity: 5
Report ID: 0216000
Contest Date:
Final Order: 11/16/2017
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/16/2017 | $12,471.00 | 02/16/2018 | Serious | |
Penalty | Z: Issued | 09/29/2017 | $7,967.00 | 10/12/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(c)(1): Each exit discharge did not lead directly outside or to a street, walkway, refuge area, public way, or open space with access to the outside: a) On or about 4/20/17, Emergency Exit discharge outside the building towards Cruger Avenue; The exit discharge area outside the building leading towards Cruger Avenue was completely fenced around and employees can only have access to the Cruger Avenue if they reach the rolling door and push a button to open it. Also this area was obstructed by numerous U-boat carts, empty trays, boxes with unpacked merchandise such as bottles of water and paper rolls , one store trash bin, ten construction trash bins and other store shelving materials, creating numerous trip/fall hazards.