Violation Detail
Standard Cited: 19100333 B02 IV Selection and use of work practices
Inspection Nr: 1222163.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $11,408.00
Current Penalty: $6,844.80
Issuance Date: 07/28/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 08/23/2017
Gravity: 10
Report ID: 0626000
Contest Date:
Final Order: 08/21/2017
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/21/2017 | $6,844.80 | 08/23/2017 | Serious | |
Penalty | Z: Issued | 07/28/2017 | $11,408.00 | 08/23/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.333(b)(2)(iv): Qualified persons did not use test equipment to test the circuit elements and electrical parts of equipment to which employees were exposed and verify the circuit elements and equipment parts were de-energized. At the facility, qualified persons instructed to service Switchgear #272 did not verify de-energization of the hazardous energy prior to commencement of work; exposing the employees to electrical shock hazards.