Standard Cited: 5A0001 OSH Act General Duty Paragraph

This violation item has been deleted.

Inspection Nr: 122185242

Citation: 01001

Citation Type: Serious

Abatement Status:

Initial Penalty: $4,200.00

Current Penalty:

Issuance Date: 12/11/2000

Nr Instances: 1

Nr Exposed: 23

Abatement Date: 01/08/2001

Gravity: 10

Report ID: 0626300

Contest Date: 01/02/2001

Final Order: 05/02/2001

Related Event Code (REC): A

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty F: Formal Settlement 05/02/2001 01/08/2001 Serious  
Penalty Z: Issued 12/11/2000 $4,200.00 01/08/2001 Serious  

Text For Citation: 01 Item/Group: 001 Hazard: FALLING

Section 5(a)(1) of the Occupational Safety and Health Act of 1970: The employer did not furnish employmnent and a place of employment which were free from recognized hazards that were causing or likely to cause death or serious physical harm to employees in that employees were exposed to a falling cooling tower structural framework: The employer failed to have available on site and follow plans and procedures that had been established to brace the framework of a cooling tower during the assembly of the structual members of the tower wherein the potential for failure of the continued integrity of the framework was recognized as being possible from known or predictable wind and wind gusts. The potential for a falling tower structural framework was demonstrated by the following instance: On or about 6/14/00, the structure of a cooling tower being erected was not properly braced according to the established plan and procedures and the structure collapsed due to a gust of wind. The end braces (struts) had been connected to the top of a conex box instead of the pad- eye type base plates imbedded in the concrete base of the structure, and had not been braced to prevent the braces from buckling at points along the length of the braces (struts) as specified in the established plans and procedures. Among other methods, recognized means of abatement include, but are not limited to: 1) Determine the possible wind load for prevailing and possible wind gusts conditions and install interim temporary braces to withstand the maximum forces predicted from the wind analysis. 2) Make available on site and follow the establised erection plan made by the company.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.