Violation Detail
Standard Cited: 19100036 H02 Design and construction requirements for exit routes.
Inspection Nr: 1219884.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $4,617.00
Current Penalty: $2,770.20
Issuance Date: 05/30/2017
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC):
Gravity: 1
Report ID: 0215800
Contest Date:
Final Order: 06/26/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/26/2017 | $2,770.20 | Serious | ||
Penalty | Z: Issued | 05/30/2017 | $4,617.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(h)(2): The outdoor exit route was not covered where snow and ice was likely to accumulate along the route: a) Exit route off boiler room, on or about 3/23/17: The outdoor exit route was not covered where snow and ice could accumulate. Abatement certification must be submitted for this item.