Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1218559.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,542.00
Current Penalty: $2,771.00
Issuance Date: 06/08/2017
Nr Instances: 1
Nr Exposed: 7
Abatement Date:
Gravity: 5
Report ID: 0522300
Contest Date:
Final Order: 06/20/2017
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 06/20/2017 | $2,771.00 | Serious | ||
| Penalty | Z: Issued | 06/08/2017 | $5,542.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: On or about n March 17,2017, the company's energy control procedures were not completed as required. Energy sources used at the facility include; but are not limited to, electrical, pneumatic and hydraulic energy.