Violation Detail
Standard Cited: 19260959 D03 I Mechanical equipment.
This violation item has been deleted.
Inspection Nr: 1218027.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $12,675.00
Current Penalty: $0.00
Issuance Date: 08/15/2017
Nr Instances: 1
Nr Exposed: 1
Related Event Code (REC): A
Gravity: 10
Report ID: 0626000
Contest Date: 09/13/2017
Final Order: 05/18/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/18/2018 | $0.00 | Serious | ||
Penalty | C: Contested | 11/15/2017 | $12,675.00 | Serious | ||
Penalty | Z: Issued | 08/15/2017 | $12,675.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.959(d)(3)(i): The energized lines exposed to contact were not covered with insulating protective material that would withstand the type of contact that could be made during the operation: Employees conducted power line upgrade installation and the energized lines were not protected by insulated protective material.