Violation Detail
Standard Cited: 19100147 C07 I A The control of hazardous energy (lockout/tagout).
Inspection Nr: 1213020.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $12,675.00
Current Penalty: $8,000.00
Issuance Date: 04/17/2017
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC): R
Gravity: 10
Report ID: 0418100
Contest Date: 05/23/2017
Final Order: 12/28/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 12/28/2017 | $8,000.00 | Serious | ||
Penalty | C: Contested | 05/30/2017 | $12,675.00 | Serious | ||
Penalty | Z: Issued | 04/17/2017 | $12,675.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(7)(i)(A): Authorized employee(s) did not receive training in the recognition of applicable hazardous energy sources, the type and magnitude of the energy available in the workplace, and the methods and means necessary for energy isolation. On 2/16/2017, at the Flowery Branch, Georgia facility, operators at the Atom Press (#33), who were designated "Affected Employees" were directed to perform Authorized work when setting up the press.