Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1211911.015
Citation: 01001
Citation Type: Serious
Abatement Date: 08/01/2017 2
Initial Penalty: $12,548.00
Current Penalty: $12,548.00
Issuance Date: 07/13/2017
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 10
Report ID: 0626700
Contest Date:
Final Order: 08/01/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/01/2017 | $12,548.00 | 08/01/2017 | Serious | |
Penalty | Z: Issued | 07/13/2017 | $12,548.00 | 08/01/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) At the conveyor, specific energy control procedures were not developed, documented and utilized for Conveyor TI40-8 EQ 1151, exposing employees to struck-by and caught-in hazards when performing maintenance tasks such as, but not limited to, cleaning the Skirt Board.