Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 1209139.015
Citation: 01001
Citation Type: Serious
Abatement Date: 06/05/2017 2
Initial Penalty: $8,873.00
Current Penalty: $2,218.25
Issuance Date: 05/02/2017
Nr Instances: 2
Nr Exposed: 2
Related Event Code (REC): R
Gravity: 10
Report ID: 0522300
Contest Date: 05/25/2017
Final Order: 03/15/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 03/15/2018 | $2,218.25 | 06/05/2017 | Serious | |
Penalty | C: Contested | 05/25/2017 | $8,873.00 | 06/05/2017 | Serious | |
Penalty | Z: Issued | 05/02/2017 | $8,873.00 | 06/05/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: On or about February 8, 2017, the employer failed to ensure an inspection was done of their energy control systems at least annually to ensure that the program was still applicable and being followed properly. The last time that this program was reviewed, per the documentation, was in 2006. Various maintenance work and other tasks are being performed by employees on equipment such as but not limited to the Pendu machine.