Violation Detail
Standard Cited: 19260600 A06 II Equipment.
Inspection Nr: 1204392.015
Citation: 01001
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,070.00
Current Penalty: $3,042.00
Issuance Date: 03/28/2017
Nr Instances: 1
Nr Exposed: 1
Abatement Date:
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 04/14/2017
Related Event Code (REC): R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/14/2017 | $3,042.00 | Serious | ||
Penalty | Z: Issued | 03/28/2017 | $5,070.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.600(a)(6)(ii): 29 CFR 1926.600(a)(6)(ii): For lines rated over 50 kV, a minimum of 10 feet plus 0.4 inch for each 1 kV over 50 kV, or twice the length of the line insulator was not maintained between the energized line and any part of the equipment or load. On or about January 18, 2017 the employer allowed the operator of the excavator to come within ten (10) feet of a 138 kV high voltage power line.