Violation Detail
Standard Cited: 19100269 A03 II A Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1204162.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,926.00
Current Penalty: $4,000.00
Issuance Date: 06/26/2017
Nr Instances: 1
Nr Exposed: 2
Abatement Date: 06/25/2018
Gravity: 5
Report ID: 0627500
Contest Date: 07/20/2017
Final Order: 06/25/2018
Related Event Code (REC): A;R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 06/25/2018 | $4,000.00 | 06/25/2018 | Serious | |
| Penalty | C: Contested | 08/07/2017 | $6,926.00 | 07/07/2017 | Serious | |
| Penalty | Z: Issued | 06/26/2017 | $6,926.00 | 07/07/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.269(a)(3)(ii)(A): The contract employer did not ensure that each of its employees was instructed in the hazardous conditions relevant to the employee's work: At the substation: On or about January 19, 2017, The contract employer did not ensure that each of its employees was instructed in the hazardous conditions relevant to the employee's work. Employees were exposed to electrical shock hazards.