Violation Detail
Standard Cited: 19150034 C01 IV Mechanical paint removers.
Inspection Nr: 1202085.015
Citation: 01001
Citation Type: Serious
Abatement Date: 04/24/2017 2
Initial Penalty: $7,333.00
Current Penalty: $3,739.00
Issuance Date: 04/18/2017
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC): R
Gravity: 5
Report ID: 0626700
Contest Date:
Final Order: 05/10/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/10/2017 | $3,739.00 | 04/24/2017 | Serious | |
Penalty | Z: Issued | 04/18/2017 | $7,333.00 | 04/24/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1915.34(c)(1)(iv): Dead man control devices were not provided at the nozzle end of the blasting hose: (a) on the vessel Seabulk, docked at Gulf Copper North Yard, #3 Port side Cargo Tank , on January 1, 2017, where the dead man control device was bypassed.