Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1198881.015
Citation: 01001
Citation Type: Serious
Abatement Date: 06/08/2017 2
Initial Penalty: $9,054.00
Current Penalty: $9,054.00
Issuance Date: 05/26/2017
Nr Instances: 1
Nr Exposed: 250
Related Event Code (REC):
Gravity: 5
Report ID: 0936300
Contest Date: 06/22/2017
Final Order: 10/06/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/06/2017 | $9,054.00 | 06/08/2017 | Serious | |
Penalty | C: Contested | 07/11/2017 | $9,054.00 | 06/08/2017 | Serious | |
Penalty | Z: Issued | 05/26/2017 | $9,054.00 | 06/08/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii): On December 16, 2016, on the center north face of the construction project, employees were working from tube and coupler scaffolding that was not fully planked. Employees were exposed to fall hazards.