Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1197093.015
Citation: 01001
Citation Type: Serious
Abatement Date: 04/12/2017 4
Initial Penalty: $8,873.00
Current Penalty: $6,000.00
Issuance Date: 03/17/2017
Nr Instances: 2
Nr Exposed: 4
Related Event Code (REC): R
Gravity: 10
Report ID: 0213100
Contest Date: 04/10/2017
Final Order: 01/22/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/22/2018 | $6,000.00 | 04/12/2017 | Serious | |
Penalty | C: Contested | 04/13/2017 | $8,873.00 | 04/12/2017 | Serious | |
Penalty | Z: Issued | 03/17/2017 | $8,873.00 | 04/12/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): a) Newman Box - On or about November 30, 2016, procedures did not include controlling the hazardous energy of the Newman Log Feed Conveyor when clearing a jam in the Newman Shaver 1 & 2. b) Facility - On or about November 30, 2016, procedures did not include controlling the hazardous energy of the Inotech Log Feed Conveyor when clearing a jam in the Inotech Shaver 1 & 2.