Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1196284.015
Citation: 01001
Citation Type: Serious
Abatement Date: 06/12/2017 2
Initial Penalty: $8,149.00
Current Penalty: $6,750.00
Issuance Date: 06/02/2017
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0215000
Contest Date:
Final Order: 07/07/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/07/2017 | $6,750.00 | 06/12/2017 | Serious | |
Penalty | Z: Issued | 06/02/2017 | $8,149.00 | 06/12/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports as specified in paragraphs 1926.451(b)(1)(i)-(ii). Location: 325 Kent Avenue, Brooklyn, NY. 4th Floor Courtyard North Side of South Tower. a) Three employees were installing clips while working on a Dunlop 12000 mast climber scaffold work platform that was not fully planked. On or about 12/09/2016.