Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
This violation item has been deleted.
Inspection Nr: 1191025.015
Citation: 01001
Citation Type: Willful
Abatement Status:
Initial Penalty: $126,749.00
Current Penalty: $0.00
Issuance Date: 04/13/2017
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 04/21/2017
Gravity: 10
Report ID: 0418600
Contest Date: 05/05/2017
Final Order: 01/16/2019
Related Event Code (REC): A;R
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 01/16/2019 | $0.00 | 04/21/2017 | Willful | |
Penalty | C: Contested | 05/05/2017 | $126,749.00 | 04/21/2017 | Willful | |
Penalty | Z: Issued | 04/13/2017 | $126,749.00 | 04/21/2017 | Willful |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: a) Electrified Monorail System; On or about October 18, 2016 and at times prior thereto, where documented procedures were not utilized for the control of potential hazardous energy, employees were exposed to caught-between, struck-by, and crush hazards, in that; the employees were required to enter the electrified monorail system with energized operating trolleys to perform servicing and maintenance activities, such as but not limited to, equipment upgrades and to reset machinery.