Violation Detail
Standard Cited: 19100147 C02 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1189183.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $124,709.00
Current Penalty: $12,471.00
Issuance Date: 04/06/2017
Nr Instances: 9
Nr Exposed: 39
Related Event Code (REC): R
Gravity: 10
Report ID: 0625700
Contest Date:
Final Order: 04/20/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/20/2017 | $12,471.00 | Serious | ||
Penalty | Z: Issued | 04/06/2017 | $124,709.00 | Willful |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(2)(ii): The employer's tagout energy control program procedures did not successfully comply with 29 CFR 1910.147(c)(3) and no lockout was provided for employee protection: On or about 11/3/16 during the poultry processing operations; the "Buddy System" was utilized instead of using the site's established lockout/tagout procedures when performing maintenance/servicing on the cage dumpers; thus exposing employees to amputation/laceration injuries/hazards.