Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
This violation item has been deleted.
Inspection Nr: 1188539.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,778.00
Current Penalty: $0.00
Issuance Date: 03/10/2017
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 03/22/2017
Gravity: 5
Report ID: 0317000
Contest Date:
Final Order: 03/31/2017
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/31/2017 | $0.00 | 03/22/2017 | Serious | |
| Penalty | Z: Issued | 03/10/2017 | $9,778.00 | 03/22/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: a) Truck Washer - The employer did not ensure that employees were protected from electrical hazards when employees were operating the Truck Washer with an energized control panel in which the path to ground was broken or interrupted. Observed on or about 24 SEP 2016.
Translate