Violation Detail
Standard Cited: 19100217 E01 I C Mechanical power presses.
Inspection Nr: 1184494.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,017.00
Current Penalty: $6,000.00
Issuance Date: 11/15/2016
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 12/17/2016
Gravity: 5
Report ID: 0523400
Contest Date:
Final Order: 12/01/2016
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/01/2016 | $6,000.00 | 12/17/2016 | Serious | |
| Penalty | Z: Issued | 11/15/2016 | $8,017.00 | 11/28/2016 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.217(e)(1)(i)(C): Maintain a certification record of each maintenance task performed under the directed component of the inspection program that includes the date of the maintenance task, the signature of the person who performed the maintenance task, and the serial number, or other identifier, of the power press maintained. (a) The Master Heavy E Die with two bolts fastened to the parallel was not included in the regular press inspection process to address the hazard of the bolts failing due to inadequate initial strength and wear and tear.
Translate