Violation Detail
Standard Cited: 19260416 A01 General requirements.
Inspection Nr: 1183941.015
Citation: 01001
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $5,612.00
Current Penalty: $3,000.00
Issuance Date: 12/01/2016
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 12/07/2016
Gravity: 5
Report ID: 0524200
Contest Date: 12/29/2016
Final Order: 06/12/2017
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/12/2017 | $3,000.00 | 12/07/2016 | Serious | |
Penalty | C: Contested | 12/30/2016 | $5,612.00 | 12/07/2016 | Serious | |
Penalty | Z: Issued | 12/01/2016 | $5,612.00 | 12/07/2016 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.416(a)(1): Employees were permitted to work in proximity to electric power circuits and were not protected against electric shock by de-energizing and grounding the circuits or effectively guarding the circuits by insulation or other means: a) On October 14, 2016, employees were exposed to electrical shock while working in close proximity to a 120/240 volt power line.