Violation Detail
Standard Cited: 19100037 A03 Maintenance, safeguards, and operational features for exit routes.
Inspection Nr: 1182201.015
Citation: 01001
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $5,070.00
Current Penalty: $3,042.00
Issuance Date: 01/30/2017
Nr Instances: 1
Nr Exposed: 48
Related Event Code (REC):
Gravity: 5
Report ID: 0213400
Contest Date:
Final Order: 02/27/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/27/2017 | $3,042.00 | Serious | ||
Penalty | Z: Issued | 01/30/2017 | $5,070.00 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.37(a)(3): Exit routes were not continuously maintained free of obstructions or impediments to full instant use in the case of fire or other emergency: Vigo Industries, LLC./320 Mill Rd/Edison, NJ 08817- warehouse: The exit route at the back of the returns department was blocked by fencing, pallets and materials. Condition noted on or about 10/6/2016.