Violation Detail
Standard Cited: 19100147 C07 I B The control of hazardous energy (lockout/tagout).
Inspection Nr: 1179491.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $12,471.00
Current Penalty: $10,000.00
Issuance Date: 12/21/2016
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 12/28/2016
Gravity: 10
Report ID: 0521700
Contest Date:
Final Order: 01/17/2017
Related Event Code (REC): R
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 01/17/2017 | $10,000.00 | 12/28/2016 | Serious | |
| Penalty | Z: Issued | 12/21/2016 | $12,471.00 | 12/28/2016 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(7)(i)(B): Each affected employee was not instructed in the purpose and use of the energy control procedure. a. On or about September 10, 2016, employees were required to operate the P68 Compound Liner Machines and the employer failed to ensure that each affected employee had received training on effective energy control procedures, thereby exposing employees to amputation hazards.