Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1178874.015
Citation: 01001
Citation Type: Serious
Abatement Date: 03/24/2017 2
Initial Penalty: $7,243.00
Current Penalty: $4,312.00
Issuance Date: 03/14/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0215800
Contest Date: 04/06/2017
Final Order: 06/19/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 06/19/2018 | $4,312.00 | 03/24/2017 | Serious | |
Penalty | C: Contested | 04/10/2017 | $7,243.00 | 03/24/2017 | Serious | |
Penalty | Z: Issued | 03/14/2017 | $7,243.00 | 03/24/2017 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.119(d)(3)(i)(B): Information pertaining to the equipment in the process did not include piping and instrumentation diagrams: a) On or about 9/21/2016, In the engine room: An unlabeled secondary valve and tee were attached to the system after vent valve V3, located near the high pressure receiver, just after the king valve, this was not denoted on the P&ID. Abatement certification is required for this item.