Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 11736154
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $210.00
Current Penalty: $50.00
Issuance Date: 03/09/1983
Nr Instances: 2
Nr Exposed:
Abatement Date: 03/28/1983
Gravity:
Report ID: 0215000
Contest Date: 06/24/1983
Final Order: 09/15/1983
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | R: Review Commission | 09/15/1983 | $50.00 | 03/28/1983 | Serious | |
Penalty | F: Formal Settlement | 03/11/1983 | $50.00 | 03/28/1983 | Serious | |
Penalty | Z: Issued | 03/09/1983 | $210.00 | 03/28/1983 | Serious |