Violation Detail
Standard Cited: 19100036 G02 Design and construction requirements for exit routes.
Inspection Nr: 1167738.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $8,908.00
Current Penalty: $7,000.00
Issuance Date: 09/01/2016
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 09/28/2016
Gravity: 5
Report ID: 0729300
Contest Date:
Final Order: 09/09/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/09/2016 | $7,000.00 | 09/28/2016 | Serious | |
Penalty | Z: Issued | 09/01/2016 | $8,908.00 | 09/28/2016 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(g)(2): Exit access(es) was not at least 28 inches (71.1 cm) wide at all points: In the stockroom, from the electrical panels to the back exit door, 21 ft of the exit way was measured at 17 inches and the remaining 14 ft was measured at 23 inches, with two points of further restriction because of materials placed in the route of exit, resulting in an employee being inhibited from exit access in the event of a fire or other emergency egress. Abatement certification and abatement documentation is required for this violation. The documentation should include written verification of abatement, applicable measurements or monitoring results, and photographs or videos which you believe will be helpful. The abatement certification sheet is enclosed with the citation(s).