Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1162113.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,741.00
Current Penalty: $2,242.80
Issuance Date: 10/19/2016
Nr Instances: 3
Nr Exposed: 2
Abatement Date: 10/31/2016
Gravity: 10
Report ID: 0522500
Contest Date:
Final Order: 11/08/2016
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/08/2016 | $2,242.80 | 10/31/2016 | Serious | |
Penalty | Z: Issued | 10/19/2016 | $3,741.00 | 10/31/2016 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds shall be fully planked or decked between the front uprights and the guardrail supports as follows: a. On or about July 14, 2016, on the West side of the Bil-Jax fabricated step frame scaffold, the platform at the upper working/walking level of the scaffold was not fully planked or decked, thereby exposing employees to a fall hazard of over 20 feet. b. On or about July 14, 2016, on the East side of the Bil-Jax fabricated step frame scaffold, the platform at the upper working/walking level of the scaffold was not fully planked or decked, thereby exposing employees to a fall hazard of 23.75 feet or more. c. On or about July 14, 2016, on the West side of the Bil-Jax fabricated step frame scaffold, the platform at the working/walking level where the employee fell from the scaffold was not fully planked or decked, thereby exposing the employee to a fall hazard of over 15 feet.