Violation Detail
Standard Cited: 19260251 E08 III Rigging equipment for material handling.
Inspection Nr: 116145418
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $1,500.00
Current Penalty: $750.00
Issuance Date: 03/07/2006
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 03/13/2006
Gravity: 03
Report ID: 0112000
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 03/10/2006 | $750.00 | 03/13/2006 | Serious | |
| Penalty | Z: Issued | 03/07/2006 | $1,500.00 | 03/13/2006 | Serious |
Translate