Violation Detail
Standard Cited: 19260251 E08 III Rigging equipment for material handling.
Inspection Nr: 116130865
Citation: 01001
Citation Type: Other
Abatement Status: X
Initial Penalty: $875.00
Current Penalty: $437.50
Issuance Date: 04/18/2003
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 04/24/2003
Gravity: 03
Report ID: 0112000
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis: X
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 05/09/2003 | $437.50 | 04/24/2003 | Other | |
| Penalty | Z: Issued | 04/18/2003 | $875.00 | 04/24/2003 | Serious |
Translate