Violation Detail
Standard Cited: 19100036 G01 Design and construction requirements for exit routes.
Inspection Nr: 1138778.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $5,000.00
Issuance Date: 07/27/2016
Nr Instances: 3
Nr Exposed: 5
Abatement Date: 06/01/2017
Gravity: 10
Report ID: 0522000
Contest Date: 08/23/2016
Final Order: 05/10/2017
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/10/2017 | $5,000.00 | 06/01/2017 | Serious | |
Penalty | C: Contested | 08/23/2016 | $7,000.00 | 08/22/2016 | Serious | |
Penalty | Z: Issued | 07/27/2016 | $7,000.00 | 08/22/2016 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.36(g)(1): The ceiling of an exit route must be at least seven feet six inches (2.3 m) high. Any projection from the ceiling must not reach a point less than six feet eight inches (2.0 m) from the floor: (a) The exit route out of the PVB room had three different locations where the ceiling was only 62 inches above the route of travel.