Violation Detail
Standard Cited: 19260858 D Removal of steel construction.
Inspection Nr: 1137705.015
Citation: 01001
Citation Type: Willful
Abatement Status: Not Completed - Employer Out of Business
Initial Penalty: $124,709.00
Current Penalty: $28,500.00
Issuance Date: 10/03/2016
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 10/07/2016
Gravity: 10
Report ID: 0524200
Contest Date: 10/28/2016
Final Order: 08/30/2018
Related Event Code (REC): A
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/30/2018 | $28,500.00 | 10/07/2016 | Willful | |
Penalty | C: Contested | 11/02/2016 | $124,709.00 | 10/07/2016 | Willful | |
Penalty | Z: Issued | 10/03/2016 | $124,709.00 | 10/07/2016 | Willful |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.858(d): Structural members being dismembered were overstressed: a) On or about April 5, 2016, at the I-90/Touhy Ave. project, employees were exposed to struck-by hazards where structural steel members were overstressed resulting in a collapse. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.