Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1125949.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $5,000.00
Issuance Date: 05/02/2016
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 05/26/2016
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 05/26/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/26/2016 | $5,000.00 | 05/26/2016 | Serious | |
Penalty | Z: Issued | 05/02/2016 | $7,000.00 | 05/26/2016 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): On or about 2/16/2016 in the press production area at 130 Quality Drive, NW in Thomson, GA: Employees setting and removing molds from the Press were not provided specific written energy control procedures that address all of the energy sources required to be de-energized while performing service and or maintenance. Press equipment energy sources were not limited to the following: a. Electrical - Max Volts 480 b. Hydraulic c. Water Pressure - Max Pound Per Square Inch (PSI) 235 d Gravity