Violation Detail
Standard Cited: 19100022 A01 General requirements.
Inspection Nr: 1102514.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,500.00
Current Penalty: $4,500.00
Issuance Date: 04/28/2016
Nr Instances: 1
Nr Exposed: 79
Abatement Date: 07/31/2017
Gravity: 5
Report ID: 0317700
Contest Date: 05/18/2016
Final Order: 06/30/2017
Related Event Code (REC):
Emphasis:
Substance: E101
Substance: M102
Substance: M110
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/30/2017 | $4,500.00 | 07/31/2017 | Serious | |
Penalty | C: Contested | 05/23/2016 | $4,500.00 | 05/28/2016 | Serious | |
Penalty | Z: Issued | 04/28/2016 | $4,500.00 | 05/28/2016 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.22(a)(1): All places of employment, passageways, storerooms or service rooms were not kept clean and orderly or in a sanitary condition: a) US GreenFiber, Production Areas: There were accumulations of cellulose fiber dust, greater than or equal to 3/16 of an inch in thickness, on elevated I-beams, piping, housings, and other horizontal surfaces, as discovered on or about 12/09/2015. ABATEMENT CERTIFICATION REQUIRED