Violation Detail
Standard Cited: 19100178 Q07 Powered industrial trucks.
Inspection Nr: 1102214.015
Citation: 01001
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 04/25/2016
Nr Instances: 1
Nr Exposed: 6
Abatement Date: 06/16/2016
Gravity:
Report ID: 0316300
Contest Date:
Final Order: 05/16/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/16/2016 | $0.00 | 06/16/2016 | Other | |
Penalty | Z: Issued | 04/25/2016 | $0.00 | 05/19/2016 | Other |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.178(q)(7): Powered industrial truck(s) which were used on a round-the-clock basis were not examined for defects after each shift: (a) On or about 11-09-2015 and times prior thereto, located at U.S. Postal Service Sandston Distribution Center, 5801 Technology Blvd. Sandston, VA 23150, Condition: Employee(s) operated powered industrial equipment without being inspected or examined for defects after each shift. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employee(s) and their representatives were informed of this abatement.