Violation Detail
Standard Cited: 19100036 B06 Design and construction requirements for exit routes.
Inspection Nr: 110139722
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $1,750.00
Current Penalty: $1,200.00
Issuance Date: 08/23/1999
Nr Instances: 10
Nr Exposed: 22
Abatement Date: 04/13/2000
Gravity: 03
Report ID: 0419700
Contest Date: 09/22/1999
Final Order: 04/13/2000
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | R: Review Commission | 04/13/2000 | $1,200.00 | 04/13/2000 | Serious | |
| Penalty | Z: Issued | 08/23/1999 | $1,750.00 | 10/08/1999 | Serious |
Translate