Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 110123072
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $100.00
Current Penalty: $100.00
Issuance Date: 04/03/1992
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 05/19/1992
Gravity: 02
Report ID: 0418300
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
Translate