Violation Detail
Standard Cited: 19100036 B04 Design and construction requirements for exit routes.
Inspection Nr: 109895169
Citation: 01001
Citation Type: Serious
Abatement Date: 08/31/1999 X
Initial Penalty: $600.00
Current Penalty: $600.00
Issuance Date: 08/25/1999
Nr Instances: 1
Nr Exposed: 17
Related Event Code (REC):
Gravity: 02
Report ID: 0215000
Contest Date:
Final Order:
Emphasis: