Violation Detail
Standard Cited: 5A0001 OSH Act General Duty Paragraph
Inspection Nr: 109857433
Citation: 01001
Citation Type: Serious
Abatement Status: X
Initial Penalty: $4,500.00
Current Penalty: $2,250.00
Issuance Date: 07/20/1995
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 07/25/1995
Gravity: 10
Report ID: 0112000
Contest Date:
Final Order:
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 08/04/1995 | $2,250.00 | 07/25/1995 | Serious | |
| Penalty | Z: Issued | 07/20/1995 | $4,500.00 | 07/25/1995 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard: UNAPEQUIP
29 CFR 1910.243(b)(2): Hose and hose connections used for conducting %% compressed air to utilize equipment was not designed for the pressure and service to which they were subjected: ASSEMBLY DEPARTMENT: A FOUR INCH WATER HOSE WAS USED FOR THE PURPOSE OF CONDUCTING COMPRESSED AIR FROM AN AIR RECEIVER TO A PIECE OF TEST EQUIPMENT. THE MANUFACTURER DID NOT INTEND FOR THE HOSE TO BE USED FOR COMPRESSED AIR APPLICATIONS.
Translate