Violation Detail
Standard Cited: 19100119 D03 I B Process safety management of highly hazardous chemicals.
Inspection Nr: 1097041.015
Citation: 01001
Citation Type: Serious
Abatement Date: 04/23/2016 2
Initial Penalty: $5,000.00
Current Penalty: $5,000.00
Issuance Date: 03/21/2016
Nr Instances: 4
Nr Exposed: 22
Related Event Code (REC): R
Gravity: 5
Report ID: 0626700
Contest Date:
Final Order: 04/21/2016
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 03/21/2016 | $5,000.00 | 04/23/2016 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.119(d)(3)(i)(B): The employer did not ensure that process safety information pertaining to the equipment in the process was included in the piping and instrument diagrams (P&IDs). On or about October 2, 2015, and times prior to, at the MEMC Pasadena, Inc. facility in Pasadena, TX, when the employer failed to include on the Piping and Instrument Diagram valves utilized for isolation in the 92300 on page 02-20-92-24-FD-06B for the following piping : a) 1" SLN-7424-151 / 1/2" FX-7415-154 (K-92350 Compressor) b) 4" SLN-7439-154 / 4" SLN-4829-154 / 1 1/2" SLN-7422B-154 / 1 1/2" SLN-7422A-304.2 (D-92350 1st Stage Inlet Dampener to K-92350 Compressor) c) 1 1/2" SLN-7422-304.2 / 2" FX-7417-154 (K92350 Compressor to D92351 2nd Stage Discharge Dampener) d) 2" WCS-7141-125 (To E-92353 Interstage Cooler) e) 2" FX-7419-154 (D-92352 to flare)