Violation Detail
Standard Cited: 19100179 B05 Overhead and gantry cranes.
Inspection Nr: 1093075.015
Citation: 01001
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,000.00
Current Penalty: $1,200.00
Issuance Date: 11/04/2015
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 12/02/2015
Gravity: 5
Report ID: 0418600
Contest Date:
Final Order: 11/23/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 11/23/2015 | $1,200.00 | 12/02/2015 | Serious | |
| Penalty | Z: Issued | 11/04/2015 | $2,000.00 | 12/02/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1910.179(b)(5): The rated load of crane(s) was not plainly marked on each side of the crane: a) At Ninth Floor Unit Two, Charles Lowman Power Plant: On or about September 16, 2015 and at times prior; the employer allowed his employees to operate an air tugger which had a pulley attached to a monorail system and the monorail system did not have its rated load marked on it exposing employees to struck-by hazards.