Violation Detail
Standard Cited: 19260451 C02 V General requirements.
Inspection Nr: 1081298.015
Citation: 01001
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $2,800.00
Current Penalty: $1,820.00
Issuance Date: 09/29/2015
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 10/19/2015
Gravity: 5
Report ID: 0316700
Contest Date: 10/15/2015
Final Order: 05/16/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 05/16/2016 | $1,820.00 | 10/19/2015 | Serious | |
Penalty | C: Contested | 10/19/2015 | $2,800.00 | 10/19/2015 | Serious | |
Penalty | Z: Issued | 09/29/2015 | $2,800.00 | 10/19/2015 | Serious |
Text For Citation: 01 Item/Group: 001 Hazard:
29 CFR 1926.451(c)(2)(v): Fork-lifts were used to support scaffold platforms while the entire platform was not attached to the fork and the fork-lift was moved horizontally while the platform was occupied: a) 844 Tuck Street, Lebanon, PA; Employees were flashing around the chimney while working on a scaffold platform that was not attached to the Pettibone Model Number 6036, on or about 07/30/2015. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.